Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Possible ferry delays at Barnston Island in Surrey. Until Mon Jan 27 at 12:00 PM PST. Ferry may carry reduced loads due to low water levels. Max 13,000kg or up to 4 cars. Last updated Thu Jan 23 at 10:14 AM PST. (DBC-72218) |
Hemlock Valley Rd |
Hemlock Valley Rd. Watch for slippery sections between the start of Hemlock Valley Rd and End of Route for 13.8 km (13 km south of Sasquatch Mountain Resort to Sasquatch Mountain Resort). Last updated Fri Jan 24 at 4:49 PM PST. (DBCRCON-211682) |
Highway 1 Both Directions |
Highway 1 , in both directions. Electrical maintenance between Spuzzum Creek Rd and Spuzzum Creek Forest Service Rd. Until Thu Jan 30. From 8:00 AM to 4:00 PM PST daily. Right lane is closed in both directions. Last updated Wed Jan 15 at 5:02 PM PST. (DBC-71993) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Last updated Fri Sep 13 at 10:04 PM PDT. (DBC-60503) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work at 202 St (Langley - District). Until Mon Jan 27. From 9:00 AM to 5:00 PM PST daily. Utility work at 202 St Exit roundabout. No lane closures in effect. Watch for road crews. Last updated Tue Jan 21 at 2:06 PM PST. (DBC-72152) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work between Exit 73 and Exit 66: 232nd St for 4.6 km (Langley - District). Until Fri Feb 7. From 9:00 AM to 5:00 PM PST on weekdays. Right lane closed. Watch for traffic control. Last updated Tue Jan 21 at 12:03 PM PST. (DBC-72150) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation between 248 St and Bradner Rd for 7.2 km (Langley - District to Abbotsford). Until Fri Jan 31 at 5:30 AM PST. From 9:00 PM to 7:30 AM PST on weekends and from 9:00 PM to 5:30 AM PST on weekdays. Centre lane blocked. Right lane is blocked. Last updated Mon Jan 6 at 10:26 AM PST. (DBC-69860) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road maintenance work between 248 St and Bradner Rd for 4.1 km (Langley - District to Abbotsford). Until Fri Jan 31. From 9:00 PM to 7:30 AM PST on weekends and from 9:00 PM to 5:30 AM PST on weekdays. Left lane is blocked. Last updated Mon Jan 6 at 10:27 AM PST. (DBC-70620) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Road maintenance work at Exit 73 (Langley - District). Until Fri Jan 31. From 9:00 PM to 7:00 AM PST on Saturday and from 9:00 PM to 5:00 AM PST on weekdays. Last updated Mon Jan 6 at 10:27 AM PST. (DBC-70621) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 83: Mt Lehman Rd and Exit 90: McCallum Rd for 7.2 km (Abbotsford). Until Fri Jan 31. From 8:30 PM to 5:30 AM PST on weekdays. Left lane is closed in both directions. Periodic right lane closures will be in effect. Last updated Mon Jan 6 at 10:29 AM PST. (DBC-71335) |
Highway 10 Both Directions |
Highway 10, in both directions. Road construction work between 232 St and the end of Highway 10 for 0.5 km (Langley - District). Until Fri Feb 28, 2025. From 8:00 AM to 4:00 PM PST daily. Right lane closed. Expect delays. Last updated Wed Nov 13 at 1:19 PM PST. (DBC-70210) |
Highway 17 Westbound |
Highway 17, westbound. Night time construction work planned between Bridgeview Dr and Tannery Rd for 3.3 km (Surrey). Starting Tue Jan 28 until Thu Jan 30 at 5:00 AM PST. From 9:00 PM to 5:00 AM PST on Tuesday and Wednesday. Road closure planned. Detour via Bridgeview Drive to Scott Road to Tannery Road. Last updated Fri Jan 24 at 12:50 PM PST. (DBC-72259) |
Highway 1A Both Directions |
Highway 1A, in both directions. Utility work between 168 St and 182 St for 1.9 km (Surrey). Until Tue Jan 28. From 9:00 AM to 2:00 PM PST daily. Right lane is blocked. Watch for traffic control. Expect delays. Last updated Wed Jan 15 at 10:54 AM PST. (DBC-71977) |
Highway 3 |
Highway 3 (Crowsnest Highway). Slushy sections between First Avalanche Gate and Sunday Summit for 78.6 km (17 km east of Hope to 32 km west of Princeton). Compact snow. Last updated Fri Jan 24 at 3:39 PM PST. (DBCRCON-211618) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Pothole repair between Exit 202: Portia and Exit 256: Coldwater Rd for 54.9 km (11 km south of Great Bear Snowshed to 29 km south of Merritt). Watch for potholes along the roadway. Drive with caution. Last updated Sat Dec 28 at 4:38 PM PST. (DBC-71507) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 272 St for 0.5 km (Maple Ridge). From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Watch for traffic control. Intermittent delays and lane closures. No work scheduled from Feb 15 - Feb 17. Next update time Tue Feb 18 at 10:00 AM PST. Last updated Fri Jan 17 at 10:39 AM PST. (DBC-70968) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work between Horne St and James St for 0.2 km (Mission). Until Fri Feb 28 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST on weekdays. Right lane closed. Last updated Tue Jan 7 at 11:39 AM PST. (DBC-71707) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road maintenance work between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (4 to 3 km east of Mission). Until Fri Jan 31 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST daily. Watch for traffic control. Last updated Mon Jan 6 at 10:31 AM PST. (DBC-71283) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work planned between Seabird Island Rd and Maria Lane for 0.4 km (Kent). Starting Mon Jan 27 until Fri Jan 31. From 9:00 AM to 3:00 PM PST daily. Work on shoulder. Watch for traffic control. Last updated Mon Jan 20 at 12:29 PM PST. (DBC-72117) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work planned between Chief Hali Rd and Seabird Island Rd for 0.2 km (Kent). Starting Mon Jan 27 until Fri Feb 7. From 9:00 AM to 3:00 PM PST on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Speed reduction to 50km/h during working periods. Last updated Wed Jan 22 at 4:35 PM PST. (DBC-71978) |
Highway 7B Eastbound |
Highway 7B (Mary Hill Bypass), eastbound. Construction work between Broadway St and Kingsway Ave for 1.2 km (Port Coquitlam). Until Mon May 12 at 2:00 PM PST. From 6:00 AM to 2:00 PM PST daily. Right lane closed. Bus stop improvement project. Last updated Thu Jan 9 at 12:17 PM PST. (DBC-70617) |
Highway 99 Northbound |
Highway 99, northbound. Maintenance planned at Massey Tunnel (Richmond). Starting Sun Jan 26 at 10:00 PM PST until Tue Jan 28 at 4:00 AM PST. From 10:00 PM to 4:00 AM PST on Sunday, Monday and Tuesday. Right lane will be closed. Watch for traffic control personnel. Last updated Thu Jan 23 at 8:56 AM PST. (DBC-72179) |
Highway 99 Both Directions |
Highway 99, in both directions. Road construction work at Exit 32: Steveston Hwy (Richmond). Until Sat Jan 25. From 10:00 PM to 5:00 AM PST on Tuesday, Wednesday, Thursday and Friday. Lane Closure. Mainline traffic will be detoured up and over the existing on/off ramps. Expect delays. Last updated Thu Jan 23 at 2:28 PM PST. (DBC-71947) |
Highway 99 |
Highway 99. Watch for slippery sections between Lil'wat Pl and the end of Highway 99 for 121.0 km (Lillooet). Compact snow. Last updated Fri Jan 24 at 9:22 PM PST. (DBCRCON-211651) |
Other Roads Westbound |
University Blvd., westbound. Maintenance between Western Parkway and Wesbrook Mall in Vancouver. Until Thu Jan 30, 2025. Shoring work on the south face of Menno Hall along University Blvd. Last updated Sun Sep 1 at 8:44 PM PDT. (DBC-67270) |
Other Roads Southbound |
Sylvester Rd, southbound. Utility work between Davies Rd and Nicomen Slough. Until Thu Feb 13. From 7:00 AM to 5:00 PM PST on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jan 21 at 11:37 AM PST. (DBC-69810) |
Other Roads Both Directions |
56th Avenue, in both directions. Geotechnical investigation between 256th St. And 264th St. Until Fri Jan 31, 2025 at 5:30 AM PST. From 9:00 PM to 5:30 AM PST daily. Early works investigation and asphalt coring. No closures Dec 21-Jan 5. Last updated Thu Nov 28 at 3:25 PM PST. (DBC-69857) |
Other Roads Westbound |
56th Ave, westbound. Construction work between 264th St and 268th St. Until Fri Jan 31, 2025. From 9:00 PM to 5:30 AM PST daily. Right lane closed. Last updated Thu Dec 12 at 8:39 AM PST. (DBC-71064) |
Other Roads Eastbound |
Cypress Bowl Road, eastbound. Electrical maintenance at Eagle Lake Access Road. Until Tue Jan 28 at 4:00 PM PST. Right lane is blocked. Shoulder closed. Last updated Mon Jan 13 at 3:35 PM PST. (DBC-71904) |
Other Roads Eastbound |
Lillooet Avenue, eastbound. Road maintenance work planned between Rockwell Drive and Spruce St in Harrison Hot Springs. Starting Tue Jan 28 until Wed Jan 29. From 7:30 AM to 4:00 PM PST daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Tue Jan 21 at 11:30 AM PST. (DBC-72145) |
Other Roads Both Directions |
56th Ave, in both directions. Geotechnical investigation planned between 256th St and 264th St. Starting Mon Jan 27 until Mon Mar 31. Last updated Fri Jan 24 at 4:17 PM PST. (DBC-72267) |