-
Lower Mainland / Highway 7 Both Directions
-
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Work days April 28-May 3. WB right turn to 272nd St closed. Detour at 263rd St. Construction speed limit 50km/hr. River Rd single lane alternating traffic as needed. Next update time Sat May 3 at 5:00 PM PDT. Last updated Sat Apr 26 at 6:01 PM PDT. (DBC-70968)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Tonight Thu Abbotsford 5 25 Pitt Meadows 6 19 White Rock 6 19 Chilliwack 6 25 Vancouver 6 19 Agassiz 6 25 Source: Environment Canada