Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. Jun 2 - Jun 7 / Jun 9 - Jun 14 / Jun 16 - Jun 21.
Construction speed zone 50km/hr. WB right turn to 272nd St closed. Detour at 263rd. Next update time Fri Jun 20 at 11:00 AM PDT. Last updated Wed Jun 4 at 7:24 AM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Industrial traffic may slow or block regular traffic. Between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (3 to 4 km east of Mission). Until Mon Jun 30 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT daily. Last updated Tue Jun 3 at 11:00 AM PDT. (DBC-77484) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Paving operations between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (3 to 4 km east of Mission). Until Mon Jun 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Utility work. Last updated Tue Jun 3 at 11:35 AM PDT. (DBC-77485) |