Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Construction work planned between Laity St and 216 St for 0.9 km (Maple Ridge). Starting Mon May 5 until Thu May 8. From 8:00 AM to 3:00 PM PDT daily. Lane Closure. Watch for traffic control personnel. Last updated Wed Apr 30 at 8:54 AM PDT. (DBC-75988) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Work days April 28-May 3. WB right turn to 272nd St closed. Detour at 263rd St. Construction speed limit 50km/hr. River Rd single lane alternating traffic as needed. Next update time Sat May 3 at 5:00 PM PDT. Last updated Sat Apr 26 at 6:01 PM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Sat May 31. From 7:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Thu Apr 24 at 7:52 AM PDT. (DBC-75710) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Roadside brushing between Cameron Rd and Bodnar Rd for 1.6 km (Kent). Until Fri May 2 at 2:00 PM PDT. From 7:00 AM to 2:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Sun Apr 27 at 5:37 PM PDT. (DBC-75859) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Utility work between Wilson Rd and Key Rd for 0.4 km (Kent). Until Mon May 12. From 9:00 AM to 3:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Mon Apr 28 at 12:03 PM PDT. (DBC-75679) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work between Ross Rd and Chawathil Rd for 6.3 km (Hope). Until Wed May 7 at 3:00 PM PDT. Right lane is blocked. Work is between Chawathil Rd. And Haig Scale. BC Hydro Utility work. Speed reduction to 50 km/hr. Last updated Wed Apr 23 at 2:53 PM PDT. (DBC-75680) |