Big Bar Reaction Ferry |
Big Bar Reaction Ferry. Seasonal shutdown at Big Bar Reaction Ferry (Big Bar Reaction Ferry). Arial Tram available to foot traffic only. Next update time Mon May 31. Last updated Thu Jan 21 at 5:18 PM PST. (DBC-24168) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work at Massey Tunnel (Richmond). Until Sun Mar 28. From 10:00 PM to 5:00 AM PST on weekdays. Replacing the tunnel roadway joints and electrical system. Starting on Jan. 3rd the NB tube will be closed during work times. Traffic counter flow to single lane traffic in the SB tube. Next update time Wed Jan 27 at 10:00 AM PST. Last updated Wed Jan 20 at 10:03 AM PST. (DBC-21852) |
Needles Ferry Both Directions |
Needles Ferry, in both directions. There will be required maintenance between Needles Ferry and Needles Ferry (Needles). Starting Mon Jan 25 at 10:00 PM PST until Tue Jan 26 at 4:00 AM PST. Ferry will be out of service. Next update time Tue Jan 26 at 4:00 AM PST. Last updated Fri Jan 22 at 11:04 AM PST. (DBC-25630) |
Other Roads Both Directions |
Soda-Creek Macalister Road, in both directions. Landslide at 10 kms from the Junction of Highway 97. Road closed. Repair methodology underway. Next update time Thu Jan 28 at 12:00 PM PST. Last updated Thu Jan 21 at 12:05 PM PST. (DBC-16911) |
Other Roads Both Directions |
Quesnel Hydraulic Road, in both directions. Washout at Kilometer 20. The road is closed. Road will be closed at km 20.3 due to ongoing land instability. Road closed temporarily. Detour available via French Rd. Next update time Thu Jan 28 at 12:00 PM PST. Last updated Thu Jan 21 at 12:00 PM PST. (DBC-17478) |
Other Roads Both Directions |
West Fraser Road , in both directions. Washout at Narcosli Creek 20 km south of Quesnel. The road is closed. Watch for traffic control. Detour in effect via Garner Road and Webster Lake Road. No estimated time of re-opening. Next update time Thu Jan 28 at 12:00 PM PST. Last updated Thu Jan 21 at 12:04 PM PST. (DBC-20298) |
Other Roads Both Directions |
Kersley-Dale Landing Rd, in both directions. Landslide at 500 meters in from Highway 97 Intersection. Road closed. Geotechnical investigation. Estimated time of opening not available. Next update time Thu Jan 28 at 12:00 PM PST. Last updated Thu Jan 21 at 12:04 PM PST. (DBC-23443) |
Upper Arrow Lake Ferry |
Upper Arrow Lake Ferry. There will be required maintenance between Shelter Bay and Galena Bay. Starting Sun Feb 7. From 10:00 PM to 5:00 AM PST on Sunday, Monday, Tuesday, Wednesday and Thursday. Road closure planned. Last sailing from Shelter Bay will be 9:00 PM. The last sailing from Galena Bay will be 9:30 PM. Next update time Thu Feb 11 at 5:00 AM PST. Last updated Fri Jan 22 at 4:13 PM PST. (DBC-25637) |
Upper Arrow Lake Ferry |
Upper Arrow Lake Ferry. There will be required maintenance between Shelter Bay and Galena Bay. Starting Sun Feb 14 at 10:00 PM PST. From 10:00 PM to 5:00 AM PST on Sunday, Monday, Tuesday, Wednesday and Thursday. Road closure planned. The last sailing from Shelter Bay will be 9:00 PM. The last sailing from Galena Bay will be 9:30 PM. Next update time Thu Feb 18 at 5:00 AM PST. Last updated Fri Jan 22 at 4:38 PM PST. (DBC-25638) |
Upper Arrow Lake Ferry |
Upper Arrow Lake Ferry. There will be required maintenance between Shelter Bay and Galena Bay. Starting Sun Feb 21 at 10:00 PM PST. From 10:00 PM to 5:00 AM PST on Sunday, Monday, Tuesday, Wednesday and Thursday. Road closure planned. The last sailing from Shelter Bay will be 9:00 PM. The last sailing from Galena Bay will be 9:30 PM. Next update time Thu Feb 25 at 5:00 AM PST. Last updated Fri Jan 22 at 4:44 PM PST. (DBC-25639) |