• Major Events
  • Big Bar Ferry Both Directions Big Bar Ferry, in both directions. Travel advisory in effect at Big Bar Ferry Terminal. Road closed for the season. Big Bar Ferry is out of service for the Winter Season. The Aerial Car is open to foot traffic only. Next update time Thu Apr 27, 2023 at 12:00 PM PST. Last updated Tue Nov 15 at 11:20 AM PST. (DBC-46517)
    Highway 1 Both Directions Highway 1 (on Vancouver Island), in both directions. Utility work planned between Exit 8: Helmcken Rd and Exit 10: Burnside Rd W for 0.9 km (View Royal). Starting Tue Mar 28 at 10:00 PM PDT until Wed Mar 29 at 6:00 AM PDT. Road will be closed intermittently. Expect minor delays. Next update time Wed Mar 29 at 6:00 AM PDT. Last updated Tue Mar 14 at 8:21 AM PDT. (DBC-50047)
    Highway 1 Eastbound Highway 1, eastbound. Vehicle incident at Exit 55: 192 St (Surrey). The off ramp from Highway 1 to 192nd Street remains closed. Highway 1 itself is open in both directions with all lanes available. The 192nd St overpass has single lane alternating traffic in effect with a weight restriction of 24,000kg in place. Next update time Sat Apr 1 at 5:00 PM PDT. Last updated Wed Mar 15 at 5:28 PM PDT. (DBC-43186)
    Highway 1 Both Directions Highway 1, in both directions. Road construction work between Ainslie Rd N and Kanaka Station Rd for 16.1 km (Jackass Mountain Summit). Watch for traffic control. Expect delays. Loads over 3.8 meters in width restricted. Road open with sections of single lane alternating traffic. Watch for traffic control. Extended delays. Next update time Mon Mar 27 at 4:30 PM PDT. Last updated Mon Mar 20 at 5:28 PM PDT. (DBC-35355)
    Highway 1 Highway 1. Avalanche control work planned between West Boundary of Mount Revelstoke National Park and Hemlock Grove Boardwalk for 31.8 km (1 km west of West Boundary of Mount Revelstoke National Park to 1 km east of West Boundary of Glacier National Park). Starting Wed Mar 22 at 2:00 PM PDT until Wed Mar 22 at 4:00 PM PDT. Road closure. No detouring. In conjunction with event #50271. Next update time Wed Mar 22 at 4:00 PM PDT. Last updated Tue Mar 21 at 11:25 PM PDT. (DBC-50270)
    Highway 1 Highway 1. Avalanche control work planned between West Boundary of Mount Revelstoke National Park and Hemlock Grove Boardwalk for 31.9 km (1 km west of West Boundary of Mount Revelstoke National Park to 2 km east of West Boundary of Glacier National Park). Starting Wed Mar 22 at 2:00 PM PDT until Wed Mar 22 at 4:00 PM PDT. Road closure. No detouring. In conjunction with event #50271. Next update time Wed Mar 22 at 4:00 PM PDT. Last updated Tue Mar 21 at 11:26 PM PDT. (DBC-50271)
    Highway 1 Highway 1. Construction work between Golden Donald Upper Rd and Yoho Bridge (4 km east of Golden). Until Sat Apr 1 at 7:00 AM MST. Delays of 30 min 9AM to 3PM Mon to Sat and 8PM to 10PM Sun to Fri. Overnight closures 10PM to 7AM Sun to Fri. Alt Route available via Hwy 95 and Hwy 93S. Allow 1.5 hrs additional time. Next update time Fri Mar 31 at 4:30 PM MST. Last updated Thu Feb 16 at 11:07 AM MST. (DBC-49213)
    Highway 10 Eastbound Highway 10, eastbound. Vehicle incident between Mufford Glover Overpass and 64 Ave for 0.8 km (Langley - District). The road is closed. Expect delays. Next update time Wed Mar 22 at 3:00 AM PDT. Last updated Wed Mar 22 at 1:01 AM PDT. (DBC-50279)
    Highway 17 Both Directions Highway 17, in both directions. Road construction work planned between Highway 91 Connector and Grace Rd (Delta). Starting Sun Apr 2 at 1:00 AM PDT until Wed Apr 5 at 4:00 AM PDT. From 1:00 AM to 4:00 AM PDT on Sunday and Wednesday. Road closure planned. Detour planned. Watch for traffic control personnel. Temporary closures will be required at the Highway 17 and River Road Interchange. Next update time Wed Apr 5 at 4:00 AM PDT. Last updated Mon Mar 13 at 3:23 PM PDT. (DBC-50020)
    Highway 17 Both Directions Highway 17, in both directions. Road construction work planned between Highway 91 Connector and Grace Rd (Delta). Starting Mon Apr 3 at 11:00 PM PDT until Tue Apr 4 at 5:00 AM PDT. Road closure planned. Detour planned. Watch for traffic control personnel. Temporary closures will be required at the Highway 17 and River Road Interchange. Next update time Tue Apr 4 at 5:00 AM PDT. Last updated Mon Mar 13 at 3:23 PM PDT. (DBC-50018)
    Highway 19 Southbound Highway 19, southbound. Electrical maintenance planned between NW Bay Logging Rd and Fredheim Rd for 1.7 km (2 to 4 km south of Parksville). Starting Wed Apr 5 at 9:00 AM PST until Thu Apr 6 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST on Wednesday and Thursday. South bound right lane closed for BC Hydro Pole Replacement on shoulder. Speed limits reduced to 60 km/h in work zone. Next update time Thu Apr 6 at 3:00 PM PST. Last updated Fri Mar 10 at 12:25 PM PST. (DBC-49952)
    Highway 19 Highway 19. Construction work between East Wellington Rd and Exit 16 for 0.7 km (Nanaimo). Until Fri Mar 31 at 3:00 PM PST. From 9:00 AM to 3:00 PM PST on weekdays. SB merge lane from Jinglepot Rd to Hwy 19 changes to a yield lane during shoulder construction, traffic lanes remain open. 70 km/h work zone speed 9AM-3PM Mon-Fri excluding weekends/holidays. Next update time Fri Mar 31 at 3:00 PM PST. Last updated Fri Mar 3 at 1:59 PM PST. (DBC-48474)
    Highway 3 Both Directions Highway 3, in both directions. Vehicle incident between Paulson Cross Country Recsite and Highway 3B (25 km west of Castlegar). The road is closed. Assessment in progress. Watch for traffic control. Next update time Wed Mar 22 at 2:15 AM PDT. Last updated Wed Mar 22 at 12:04 AM PDT. (DBC-50280)
    Highway 3 Highway 3. Avalanche control work planned between West Avalanche Gate and East Avalanche Gate for 18.0 km (Kootenay Pass). Starting Wed Mar 22 at 2:00 PM PDT until Wed Mar 22 at 6:00 PM PDT. Road closure planned. Alternate route available from Nelson to Creston, Highway 3A, Kootenay Lake Ferry, estimated travel time 2.5 hours. Next update time Wed Mar 22 at 6:00 PM PDT. Last updated Tue Mar 21 at 2:23 PM PDT. (DBC-50265)
    Highway 33 Both Directions Highway 33, in both directions. Vehicle incident between Cardinal Creek Rd and Goudie Rd for 6.0 km (3 to 9 km south of Kelowna). The road is closed. Detour in effect. Detour available at Goudie Road to Sunvalley Road to Cardinal Creek Road Assessment in progress. Next update time Wed Mar 22 at 2:00 AM PDT. Last updated Wed Mar 22 at 12:45 AM PDT. (DBC-50276)
    Highway 4 Highway 4. Electrical maintenance planned between Wick Rd and Thunderous Bridge for 0.2 km (1 km east of Southern Boundary of Pacific Rim National Park). Starting Sat Apr 1 at 7:00 AM PST until Sun Apr 2 at 5:00 PM PST. Work in the Tofino-Ucluelet Junction to repair overhead BC Hydro infrastructure. The Junction will be controlled by traffic control personnel. Speed limits will be limited to 50 km/h. Next update time Sun Apr 2 at 5:00 PM PST. Last updated Tue Mar 7 at 8:31 AM PST. (DBC-49414)
    Highway 4 Highway 4. Electrical maintenance planned at Toquart Bay Rd (13 km east of Southern Boundary of Pacific Rim National Park). Starting Sun Apr 2 at 8:00 AM PST until Sun Apr 2 at 5:00 PM PST. WB lane will be closed to allow BCHydro maintenance on the shoulder. Speed limits will be reduced to 50km/h. Next update time Sun Apr 2 at 5:00 PM PST. Last updated Thu Mar 9 at 8:24 AM PST. (DBC-49450)
    Highway 4 Both Directions Highway 4, in both directions. Electrical maintenance planned at Hydro Hill West Creek (23 km east of Southern Boundary of Pacific Rim National Park). Starting Sat Apr 1 at 8:00 AM PST until Sun Apr 2 at 5:00 PM PST. EB lane will be closed to allow for BCHydro maintenance on the shoulder. Speed limits will be reduced to 50km/h. Next update time Sun Apr 2 at 5:00 PM PST. Last updated Thu Mar 9 at 8:24 AM PST. (DBC-49446)
    Highway 4 Highway 4. Electrical maintenance planned between Hydro Hill West Creek and Kennedy River Rest Area for 0.7 km (24 to 25 km west of Sutton Pass Summit). Starting Sat Apr 1 at 10:00 AM PST until Sun Apr 2 at 5:00 PM PST. West bound lane closed for Hydro maintenance. Speed limits will be reduced to 50 km/h in work zone. Estimated time of re-opening Sun Apr 2 at 5:00 PM PST. Next update time Sun Apr 2 at 5:00 PM PST. Last updated Tue Mar 7 at 8:25 AM PST. (DBC-49791)
    Highway 4 Westbound Highway 4, westbound. Electrical maintenance planned at Sutton Pass Summit (3 km west of Sutton Pass Summit). Starting Sat Apr 1 at 8:00 AM PST until Sun Apr 2 at 5:00 PM PST. Right lane will be closed. BC Hydro maintenance. Speed limit reduced to 50 km/h. Next update time Sun Apr 2 at 5:00 PM PST. Last updated Thu Mar 9 at 8:22 AM PST. (DBC-49449)
    Highway 8 Both Directions Highway 8, in both directions. Construction work between the start of Highway 8 and the end of Highway 8 for 63.5 km (Spences Bridge to Merritt). Sections of gravel. Obey all signage including traffic signals for one-way bridges. Highway 8 won't be used as a detour route in the event of other Highway closures. Next update time Thu Apr 13 at 12:00 PM PDT. Last updated Mon Mar 13 at 12:09 PM PDT. (DBC-46591)
    Highway 97 Both Directions Highway 97, in both directions. Bridge maintenance between Railway Rd and Ferry Ave for 0.9 km (Prince George). Until Sat Sep 30. From 7:00 AM to 5:00 PM PST daily. Northbound lanes closed, with 2-way traffic in effect using Southbound lanes. Motorists should expect traffic disruption at all times. Please obey speed limits, and traffic control. Boundary Road is available as a detour. Next update time Fri Sep 29 at 12:00 PM PST. Last updated Fri Mar 10 at 2:47 PM PST. (DBC-49950)
    Other Roads Both Directions Soda-Creek Macalister Road, in both directions. Landslide at 10 kms from the Junction of Highway 97. Road closed. Geotech assessment underway. Next update time Fri Apr 14 at 2:00 PM PDT. Last updated Wed Mar 15 at 2:00 PM PDT. (DBC-16911)
    Other Roads Both Directions West Fraser Road , in both directions. Washout at Narcosli Creek 20 km south of Quesnel. The road is closed. Detour in effect via Garner Road and Webster Lake Road. No estimated time of re-opening. Next update time Fri Jun 16, 2023 at 8:00 AM PST. Last updated Wed Nov 30 at 7:11 PM PST. (DBC-20298)
    Other Roads Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Fri Apr 14 at 2:00 PM PDT. Last updated Wed Mar 15 at 2:00 PM PDT. (DBC-23443)
    Other Roads Both Directions Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Fri Apr 14 at 2:00 PM PDT. Last updated Wed Mar 15 at 2:00 PM PDT. (DBC-27390)
    Other Roads Both Directions Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Fri Apr 14 at 2:00 PM PDT. Last updated Wed Mar 15 at 1:59 PM PDT. (DBC-28386)
    Other Roads Allenby Road. Mudslide between Miller Road and Boys Road. Road closed. Assessment in progress. Alternate routes available. Next update time Tue May 2 at 3:00 PM PST. Last updated Thu Mar 2 at 4:45 PM PST. (DBC-35173)
    Other Roads Both Directions Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Fri Mar 31 at 9:00 AM PST. Last updated Tue Jan 10 at 10:21 AM PST. (DBC-35978)
    Other Roads Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Jun 7, 2023 at 2:00 PM PST. Last updated Wed Dec 7 at 2:44 PM PST. (DBC-47311)
    Other Roads Mary Ellen Drive. Construction work between Island Hwy N and Nanaimo Pkwy in Nanaimo. Until Fri Mar 31 at 6:00 AM PST. From 5:00 AM to 6:00 PM PST on weekdays. The road is closed. Closure Mon. Thru Fri. From 6PM to 6AM, excluding weekends and holidays. Motorists traveling between Island Hwy N and Nanaimo Pkwy should use Aulds Rd. During the closure. Next update time Fri Mar 31 at 6:00 AM PST. Last updated Tue Feb 7 at 4:28 PM PST. (DBC-48962)
    Other Roads Both Directions Jingle Pot Road, in both directions. Construction work between Allsop Rd and W Rd in Nanaimo. Until Thu Jun 1 at 5:00 PM PST. From 7:00 AM to 5:00 PM PST on weekdays. Speed limits through the construction area are reduced to 30 km/h for the duration of work, to allow for the safe movement of construction vehicles into and out of the site. Estimated time of re-opening Thu Jun 1 at 5:00 PM PST. Next update time Thu Jun 1 at 5:00 PM PST. Last updated Wed Mar 1 at 1:03 PM PST. (DBC-48998)
    Other Roads Chaumox Road. Construction work planned between Boston Bar Landliff and North Bend near Yale. Starting Wed Mar 29 until Fri Mar 31. From 8:00 AM to 5:00 PM PST on Wednesday, Thursday and Friday. Watch for traffic control personnel. Expect closures of up to 2 hours. Next update time Fri Mar 31 at 5:00 PM PST. Last updated Mon Feb 27 at 4:17 PM PST. (DBC-49573)
    Other Roads Both Directions Burnside Rd West, in both directions. Utility work planned between Highway 1 Exit Ramp and Watkiss Way. Starting Tue Mar 28 at 10:00 PM PDT until Wed Mar 29 at 6:00 AM PDT. Road closure planned. Watch for traffic control personnel. Next update time Wed Mar 29 at 6:00 AM PDT. Last updated Tue Mar 14 at 8:18 AM PDT. (DBC-50046)
    Other Roads Westbound Highway 91 Connector, westbound. Road construction work at Nordel Way. Until Fri Apr 14 at 5:00 AM PDT. From 11:00 PM to 5:00 AM PDT on weekdays. Entrance ramp closed. Detour south via Hwy 91C and Nordel Way to Hwy 91C eastbound onramp to Hwy 91 to 64 Ave exit back to Hwy 91 northbound to exit 8 Nordel Way westbound. Next update time Fri Apr 14 at 5:00 AM PDT. Last updated Thu Mar 16 at 9:59 AM PDT. (DBC-50133)
    Other Roads Westbound Highway 91C, westbound. Road construction work planned at Nordel Way offramp. Starting Sun Apr 16 at 1:00 AM PDT until Sun Apr 16 at 4:00 AM PDT. Exit ramp will be closed. Detour planned. Follow signs for River Road west and return to Highway 17 westbound via the River Road roundabout. Take the interchange ramp to Highway 91C eastbound and exit at Nordel Way west. Next update time Sun Apr 16 at 4:00 AM PDT. Last updated Fri Mar 17 at 2:30 PM PDT. (DBC-50166)