Highway 97 |
Highway 97 (Alaska Highway). Bridge maintenance planned between Taylor Bridge and McMahon Dr for 1.1 km (Taylor). Starting Fri Apr 19 at 7:00 PM MST until Sat Apr 20 at 3:00 AM MST. Single lane alternating traffic will be in effect. Expect delays. Overweight/oversized loads exceeding widths of 3.85m will be required to wait until after 3:00am to cross. Please schedule oversized loads between 7:00pm-3:00am. Last updated Thu Apr 18 at 9:57 AM MST. (DBC-62742) |
Other Roads |
Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge closed. Slide impacting bridge structure, assessment underway. Next update time Wed May 1 at 1:30 PM MST. Last updated Mon Apr 1 at 3:11 PM MST. (DBC-30093) |
Other Roads Both Directions |
Clairmont Frontage Rd., in both directions. Utility work planned between 269 Rd. And Hemlock Ave. Starting Fri Apr 19 at 9:00 AM MST until Fri Apr 19 at 6:00 PM MST. Single lane alternating traffic will be in effect. BC Hydro resetting pole. Short 5 to 10 minute holds. Emergency vehicle and school buses will have the right of way. Last updated Tue Apr 16 at 4:50 PM MST. (DBC-62788) |
Other Roads Both Directions |
Kinuseo Falls Rd, in both directions. Blasting planned between 4 km and 6km near Tumbler Ridge. Starting Sun Apr 21 until Sun May 12. From 8:00 AM to 6:00 PM MST daily. Road will be closed intermittently. Watch for traffic control personnel. Two blasting windows will occur each day, one between 9:00AM and 11:00AM and one between 3:00PM and 5:00PM. Closures will be between 30-60 minutes. Last updated Thu Apr 18 at 10:59 AM MST. (DBC-62877) |