Highway 97 Both Directions |
Highway 97, in both directions. Landslide between Callan Rd and N Beach Rd for 1.5 km (2 to 1 km north of Summerland). Landslide between Callan Rd and N Beach Rd. Road open to two-way traffic. Expect intermittent closures of 15 minutes. Next update time Mon Oct 7 at 12:30 PM PDT. Last updated Wed Jul 24 at 12:40 PM PDT. (DBC-55794) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting planned between Planter Rd and Coburn St for 2.8 km (Chase). Starting Mon Jul 29 at 5:00 AM PDT until Fri Sep 27 at 4:00 PM PDT. From 5:00 AM to 4:00 PM PDT on weekdays and Saturday. Lane Closure. Construction in both directions. Random stoppages of 5 minutes. Blasting closures most days between 9:00 AM to 1:00 PM for 20 minutes. Last updated Tue Jul 23 at 1:31 PM PDT. (DBC-66492) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 6:00 AM to 5:00 PM PDT on weekdays. Blasting. Road closed intermittently. Watch for traffic control. Next update time Fri Aug 30 at 10:00 AM PDT. Last updated Fri Jul 26 at 10:19 AM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Tappen Valley Rd for 3.2 km (Tappen). Until Tue Dec 31. From 7:00 AM to 12:00 AM PDT on weekdays and Saturday. Expect delays. Reduced speed through work zone at 80 km/hr during inactive work, 60 km/hr during active work. Intermittent minor stoppages. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57219) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Ditching between Bolton Rd and Schneider Pl (1 km east of Tappen). Until Sat Aug 31. From 7:00 PM to 10:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays up to 20 minutes. Last updated Tue May 28 at 2:21 PM PDT. (DBC-64006) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW (1 km west of Salmon Arm). Until Thu Oct 31. From 5:30 PM to 3:00 AM PDT and from 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Up to one 20 minute closure daily. Additional 5 minute closures may be required intermittently. Watch for traffic control. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57687) |
Highway 3A Both Directions |
Highway 3A, in both directions. Utility work between Upper Bench Rd and Liddicoat Rd for 0.9 km (Keremeos to 1 km east of Keremeos). Until Fri Aug 9. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Expect delays. Last updated Tue Jul 23 at 8:27 AM PDT. (DBC-66476) |
Highway 5A Both Directions |
Highway 5A, in both directions. Construction work at Airport Rd (Princeton). Until Wed Jul 31 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Work is between Airport Road and Coyote Valley Rd. Please obey all construction signs and watch for crews and equipment. Last updated Mon Jul 15 at 3:11 PM PDT. (DBC-66203) |
Highway 6 EW |
Highway 6 EW. Wildlife advisory in effect between Chouinard Rd and Monashee Summit for 42.0 km (Cherryville to 1 km west of Monashee Summit). Until Mon Sep 2 at 12:00 PM PDT. Last updated Thu Jul 25 at 2:36 PM PDT. (DBC-55876) |
Highway 97 Both Directions |
Highway 97, in both directions. Paving operations between Okanagan Game Farm Rd and W Duncan Ave for 10.9 km (Penticton). Until Tue Aug 20 at 7:00 AM PDT. Lane Closure. Delays up to 15 minute. Please watch for and obey the instructions of Traffic Control Personnel. Last updated Thu Jul 18 at 2:29 PM PDT. (DBC-66292) |
Highway 97 Both Directions |
Highway 97, in both directions. Maintenance between Abbott St and Old Vernon Rd for 10.0 km (Kelowna). Until Thu Oct 31 at 6:00 AM PDT. Centre lane is closed in both directions. Median Landscaping - Intermittently moving work between 10 pm and 6 am Monday, Tuesday, Wednesday from July 24 to October 31. Centre lane closed in both directions. Delay length of 5 minutes in all directions. Last updated Thu Jul 25 at 1:24 PM PDT. (DBC-66569) |
Highway 97A |
Highway 97A. Construction work between Fortune Rd and King Ave for 0.3 km (Enderby). Until Sat Aug 10. Watch for traffic control. Intermittent minor stoppages. Last updated Fri Jul 19 at 4:14 PM PDT. (DBC-66367) |
Other Roads Both Directions |
Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Mon Sep 9 at 3:00 PM PDT. Last updated Mon Jul 8 at 3:46 PM PDT. (DBC-35978) |
Other Roads |
Ashnola Rd. Bridge maintenance between River Rd and Highway 3. Until Fri Aug 2. From 8:30 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Road closed. Bridge will re-open after 3:00pm daily. Last updated Thu Jun 20 at 11:13 AM PDT. (DBC-65385) |
Other Roads Both Directions |
East and West, in both directions. Utility work planned between Bryden Rd and Barber Rd near Kelowna. Starting Tue Sep 24 at 9:00 AM PDT until Tue Sep 24 at 3:00 PM PDT. Lane Closure. Fibre Optic removal and placement. Single lane closure between Bryden Rd and Barber Rd. Approx. Delay of 5 minutes east and west bound. Last updated Thu Jul 25 at 1:35 PM PDT. (DBC-66570) |