Highway 99A Both Directions |
Highway 99A (King George Blvd), in both directions. Paving operations planned between Crescent Rd and 40 Ave for 0.8 km (Surrey). Starting Mon Apr 29 until Fri May 17. From 7:00 AM to 5:00 PM PDT daily. Roadway is reduced to a single lane in each direction. Shoulder is closed. Watch for traffic control personnel. Last updated Mon Apr 22 at 2:59 PM PDT. (DBC-63034) |