• Events for Highway 17
  • Highway 17 Both Directions Highway 17, in both directions. Construction work between 92nd Street and 96th Street. Until Wed Nov 30. Lane closures in both directions planned. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Last updated Mon Mar 14 at 9:19 AM PDT. (DBC-21374)
    Highway 17 Both Directions Highway 17, in both directions. Construction work between Exit 19: Island View Rd and Exit 26: McTavish Rd for 2.0 km (Central Saanich). Until Sun Aug 14. From 7:00 AM to 6:00 PM PDT on weekdays and Saturday. Watch for traffic control. Expect minor delays. Last updated Mon Mar 28 at 8:37 AM PDT. (DBC-38624)
    Highway 17 Highway 17. Utility work planned between Exit 21: Mt Newton Cross Rd and Exit 26: McTavish Rd for 0.4 km (North Saanich). Starting Mon Sep 5 until Fri Sep 9. From 10:00 PM to 5:00 AM PDT on weekdays. Expect delays. Lane Closure. Centre lane will be closed in both directions. Last updated Mon May 2 at 1:48 PM PDT. (DBC-40557)
    Highway 17 Highway 17. Utility work between 72 St and 80 St Conn for 2.0 km (Delta). Until Tue Aug 30. From 6:30 PM to 5:30 AM PDT daily. Right lane closed. Watch for traffic control. Last updated Thu Jun 16 at 10:47 AM PDT. (DBC-42326)
    Highway 17 Both Directions Highway 17, in both directions. Road maintenance work at Highway 91 Connector (Delta). Until Wed Aug 31. From 9:30 AM to 3:00 PM PDT daily. Shoulder closed. Watch for traffic control. Closures will tentatively be needed approximately weekly during the period noted above. Maximum, 3x weekly, minimum, twice monthly. Last updated Thu Jun 16 at 4:23 PM PDT. (DBC-42339)
    Highway 17 Eastbound Highway 17, eastbound. Road maintenance work between Highway 91 Connector and Tannery Rd for 6.9 km (Delta to Surrey). Until Wed Aug 31. From 9:30 AM to 3:00 PM PDT daily. Centre lane closed. Watch for traffic control. Closures will tentatively be needed approximately weekly during the period noted above. Maximum, 3x weekly, minimum, twice monthly. Last updated Thu Jun 16 at 4:28 PM PDT. (DBC-42340)
    Highway 17 Highway 17. Construction work between Highway 91 Connector and Grace Rd (Delta). Until Wed Nov 30. Please slow down and watch for and obey traffic signage and personnel. Expect delays. Plan your route ahead. Last updated Mon Mar 14 at 9:20 AM PDT. (DBC-23431)
    Highway 17 Eastbound Highway 17, eastbound. Utility work planned between Old Yale Rd and Bridgeview Dr for 0.5 km (Surrey). Starting Mon Aug 8 at 9:00 AM PDT until Mon Aug 8 at 3:00 PM PDT. Right lane will be closed. Expect delays. Last updated Wed Aug 3 at 12:20 PM PDT. (DBC-43834)
    Highway 17 Eastbound Highway 17, eastbound. Road maintenance work between 136 St and 104 Ave (Surrey). Until Mon Aug 8 at 4:00 AM PDT. Rolling right lane closure. Last updated Sun Aug 7 at 8:57 PM PDT. (DBC-43956)