Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Church Rd and Phillips Rd for 1.1 km (Sooke). Until Wed Dec 31 at 12:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Mon May 5 at 7:43 AM PDT. (DBC-75277) |
Highway 14 Westbound |
Highway 14, westbound. Utility work planned between Humpback Rd and Kangaroo Rd for 1.5 km (Metchosin). Starting Thu Jun 19 at 9:00 AM PDT until Thu Jun 19 at 3:00 PM PDT. Shoulder maintenance planned. Last updated Tue Jun 10 at 10:18 AM PDT. (DBC-77803) |
Highway 14 Both Directions |
Highway 14, in both directions. Paving operations between Veterans Memorial Pky and the end of Highway 14 for 3.3 km (Colwood to Langford). Until Fri Jul 18 at 5:30 AM PDT. From 7:30 PM to 5:30 AM PDT on weekdays and Sunday. Lane closures along with a traffic pattern change will be in effect. Watch for crews. Last updated Wed Jun 11 at 11:08 AM PDT. (DBC-77869) |