Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Until Tue Mar 4 at 7:00 AM PST. Lane closures in both directions. Construction speed zone in effect. The SB bridge closed for repairs. All Traffic diverted onto the NB bridge. No overwidth protocols in effect up to 4.4m. Next update time Tue Mar 4 at 7:00 AM PST. Last updated Thu Feb 13 at 1:53 PM PST. (DBC-70685) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Vehicle incident between Exit 48: 152 St and Port Mann East Service Rd for 1.4 km (Surrey). Two left lanes blocked. Next update time Sat Feb 15 at 7:00 PM PST. Last updated Sat Feb 15 at 6:09 PM PST. (DBC-72914) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 60km/h limit through work zone. Intermittent delays of up to 5 minutes. Four stoppages of up to 20 minutes between 9 AM and 3 PM. Watch for traffic control. Next update time Tue Apr 1 at 5:00 PM PST. Last updated Thu Jan 23 at 10:11 AM PST. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Schneider Pl for 4.5 km (Tappen). Until Sat Oct 31, 2026. From 7:00 AM to 4:00 AM PST on weekdays and Saturday. Expect up to 30 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Thu Feb 27 at 5:00 AM PST. Last updated Mon Jan 27 at 12:01 PM PST. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Wed Dec 31. From 7:00 AM to 4:00 AM PST on weekdays and Saturday. 20 minute closure at 1 PM and 30 minute closure at 7 PM daily. Intermittent 5 minute closures and single lane alternating traffic may be required between 7 AM and 4 AM. Next update time Thu Feb 27 at 5:00 PM PST. Last updated Mon Jan 27 at 12:01 PM PST. (DBC-72305) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PST on weekdays and Saturday. No work will be happening during the long weekend. A full closure will take place on Tuesday from noon-3:00pm, then single lane alternating traffic from 8:00pm-6:00am. Next update time Sun Feb 16 at 12:00 PM PST. Last updated Fri Feb 14 at 9:18 AM PST. (DBC-70490) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. There is a multi-vehicle incident between Last Spike Historic Site and Avoca Rd W for 2.4 km (22 to 25 km east of Sicamous). Emergency vehicles on scene. Road closed to all traffic except emergency vehicles. Detour not available. Next update time Sat Feb 15 at 9:00 PM PST. Last updated Sat Feb 15 at 5:48 PM PST. (DBC-72912) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Vehicle incident between Bowolin Rd and Highway 23 South for 40.6 km (26 km east of Sicamous to Revelstoke). Assessment in progress. Road closed. Road Closure in conjunction with Area 13 Closure # 72912. Next update time Sat Feb 15 at 10:00 PM PST. Last updated Sat Feb 15 at 6:14 PM PST. (DBC-72913) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Frayne Rd and Butterfield Rd for 0.8 km (Mill Bay). Starting Tue Feb 25 at 9:00 AM PST until Tue Feb 25 at 3:00 PM PST. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Utility Work - watch for work crews. Last updated Mon Feb 10 at 10:10 AM PST. (DBC-72727) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Cowichan Bay Rd and Koksilah Rd for 3.3 km (Cobble Hill). Starting Tue Feb 18 at 9:00 AM PST until Fri Feb 21 at 3:00 PM PST. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Utility work - watch for work crews and speed reduction. Last updated Thu Feb 13 at 11:43 AM PST. (DBC-72853) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned between Radford Rd and Edgelow Rd for 0.1 km (2 km south of Ladysmith). Starting Wed Feb 19 at 8:00 AM PST until Wed Feb 19 at 3:30 PM PST. Single lane alternating traffic will be in effect. Expect delays. Speed Reduction in Effect. Last updated Wed Feb 12 at 2:09 PM PST. (DBC-72814) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Electrical maintenance planned between Davis Rd and Buller St for 0.1 km (Ladysmith). Starting Tue Feb 18 at 8:00 AM PST until Tue Feb 18 at 3:30 PM PST. Single lane alternating traffic will be in effect. Expect delays. Speed Reduction in Effect. Last updated Wed Feb 12 at 2:09 PM PST. (DBC-72815) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work between Brenton-Page Rd and Timberlands Rd for 2.2 km (6 to 4 km north of Ladysmith). Until Fri Feb 28 at 6:00 AM PST. Right lane closed. Expect minor delays. Watch for traffic control. Watermain install - watch for speed reduction and work crews. Last updated Thu Feb 6 at 2:21 PM PST. (DBC-71940) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Finlayson St and Nicol St for 0.3 km (Nanaimo). Until Fri Feb 28 at 3:00 PM PST. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Watch for work crews. Last updated Fri Jan 24 at 9:59 AM PST. (DBC-70846) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Last updated Fri Sep 13 at 10:04 PM PDT. (DBC-60503) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between United Blvd and Port Mann East Service Rd for 1.9 km (Coquitlam to Surrey). Until Sun Feb 16 at 10:00 AM PST. From 7:00 PM to 10:00 AM PST on weekends and Friday. Expect delays. HOV lane closed. Snow and Ice program Winter Operations. Please drive for winter conditions and obey traffic control equipment and signs. Last updated Thu Feb 13 at 5:18 PM PST. (DBC-72868) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Shoulder maintenance planned at 248 St (Langley - District). Starting Mon Feb 24 at 9:00 AM PST until Mon Feb 24 at 5:00 PM PST. Watch for traffic control personnel. Pass with caution. Last updated Fri Feb 14 at 9:36 AM PST. (DBC-72883) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Geotechnical investigation between 248 St and Exit 73 for 2.3 km (Langley - District). Until Mon Mar 31. From 9:00 AM to 5:30 AM PST daily. Lane closures in effect. Intermittent 20 minute holds as required between 11:30 PM and 4:30 AM. Closure of the 264th off ramp as required. Watch for traffic control. Last updated Tue Feb 11 at 9:42 AM PST. (DBC-72761) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Exit 83: Mt Lehman Rd and Exit 90: McCallum Rd for 3.9 km (Abbotsford). Until Fri Feb 28. From 8:30 PM to 5:30 AM PST on weekdays and Sunday. Left lane is closed in both directions. Watch for traffic control. Right lane closed intermittently. Last updated Wed Jan 29 at 5:33 PM PST. (DBC-72384) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road maintenance work planned between Exit 160: Hunter Creek Rd and Exit 168: Flood Hope Rd for 7.9 km (Hope). Starting Thu Feb 20 at 7:00 AM PST until Thu Feb 20 at 7:00 PM PST. Centre lane will be closed. Shoulder will be closed. Watch for traffic control personnel. Last updated Fri Feb 14 at 3:17 PM PST. (DBC-72898) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for slippery sections at Johnson Rd (13 km north of Yale). Until Wed Feb 19 at 4:00 PM PST. Slow down and drive to winter conditions. Speed reduction to 60km/hr in place at Sailor Bar tunnel for ice concerns in tunnel. Both directions. Next update time Wed Feb 19 at 4:00 PM PST. Last updated Wed Feb 12 at 4:55 PM PST. (DBC-72830) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Junction Hwy 12 and George Rd for 0.8 km (Lytton). Starting Wed Feb 19 at 9:00 AM PST until Thu Feb 20 at 4:00 PM PST. Lane Closure. Watch for traffic control personnel. Last updated Thu Feb 13 at 3:37 PM PST. (DBC-72867) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Main St and Nicomen River Rd for 1.3 km (5 to 6 km east of Lytton). Starting Tue Feb 25 at 8:00 AM PST until Tue Feb 25 at 4:00 PM PST. Right lane will be closed in both directions. Expect minor delays. Watch for traffic control personnel. Last updated Thu Feb 13 at 3:19 PM PST. (DBC-72865) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work between Gladwin Rd and Nicomen River Rd for 4.0 km (10 to 14 km east of Lytton). Until Sun Feb 23 at 7:00 PM PST. Single lane alternating traffic. Watch for traffic control. Last updated Sun Feb 9 at 1:15 PM PST. (DBC-72714) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Gladwin Rd and Nicomen River Rd for 0.1 km (10 km east of Lytton). Until Mon Sep 15 at 10:00 AM PST. From 7:00 AM to 5:30 PM PST daily. Intermittent traffic stoppages and single lane alternating traffic. Expect up to 40 minute delays due to railway crossing and construction activities. Next update time Mon Sep 15 at 10:00 AM PST. Last updated Sat Jan 4 at 6:11 PM PST. (DBC-69330) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work at Caen Rd (18 km west of Tappen). Until Wed Feb 26. From 7:00 AM to 7:00 PM PST daily. Shoulder maintenance. No lane closures Noon Feb 14 to 7am Feb 18. Last updated Mon Feb 10 at 4:59 PM PST. (DBC-72739) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Canoe Beach Dr NE and Old Sicamous Rd for 19.1 km (Salmon Arm to Sicamous). Until Fri Mar 14 at 4:00 PM PST. Single lane alternating traffic. Last updated Wed Jan 22 at 12:17 PM PST. (DBC-72184) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed between Lybarger Rd and Last Spike Historic Site for 1.0 km (22 to 21 km east of Sicamous). Restrooms out of order. Last updated Tue Feb 11 at 9:49 AM PST. (DBC-72765) |
Highway 1 |
Highway 1 (TransCanada Highway). Watch for slippery sections between Perry River Bridge and Victoria Rd W for 42.0 km (25 km east of Sicamous to Revelstoke). Last updated Sat Feb 15 at 1:04 PM PST. (DBCRCON-215657) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation planned at Highway 23 South (Revelstoke). Starting Tue Feb 18 until Fri Feb 21. From 8:00 AM to 6:00 PM PST on weekdays. Industrial traffic may slow or block regular traffic. Shoulder will be closed. Last updated Fri Feb 14 at 2:57 PM PST. (DBC-72824) |
Highway 1 |
Highway 1 (TransCanada Highway). Watch for slippery sections between Victoria Rd W and Quartz Creek Bridge (Structure) for 105.2 km (Revelstoke to 14 km east of East Boundary of Glacier National Park). Compact snow. Last updated Sat Feb 15 at 1:04 PM PST. (DBCRCON-215658) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work planned at Skunk Cabbage Boardwalk (4 km west of East Boundary of Mount Revelstoke National Park). Starting Thu Feb 20 at 9:00 AM PST until Thu Feb 20 at 5:00 PM PST. Right lane will be blocked. Speed reduction in place. Last updated Thu Feb 13 at 7:22 AM PST. (DBC-72839) |
Highway 1 |
Highway 1 (TransCanada Highway). Watch for slippery sections between Columbia West FSR and BC/Alberta Border for 113.7 km (14 km east of East Boundary of Glacier National Park to 16 km east of Field). Last updated Sat Feb 15 at 2:04 PM MST. (DBCRCON-215928) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Last updated Wed Jan 15 at 1:22 AM MST. (DBC-44269) |