DriveBC Road Conditions and Events

  • Events for Crowsnest (#3) - Creston to Alberta
  • Highway 3 Both directions Paving from Junction with Highway 93 and 95 to HaHa Creek 20 km east of Junction with Highway 93 and 95 (20 km), 7:00 am to 7:00 pm daily through Jun 20. The road is reduced to single lane alternating traffic with up to 20 minutes delay. Updated on Mon Apr 15 at 7:30 am PDT. (ID# -39859)
    Highway 3 Both directions Construction 3 km west of Sparwood 6:00 am to 4:00 pm Mon-Sat through May 29. The road is reduced to single lane alternating traffic. Updated on Thu May 23 at 9:16 am PDT. (ID# -41185)
    Highway 3 Both directions Bridge Construction 15 km east of Sparwood 6:00 am to 4:00 pm Mon-Sat through Sep 30. Updated on Fri Apr 12 at 9:09 am PDT. (ID# -39886)

Share

© BC Ministry of Transportation and Infrastructure

Home | About | Help | Feedback